Morning Everyone,
Just a question regarding the WoN Installation for when i finally come off shift in about 4½ weeks time.
I have i think a SB100i Kit with Minimax Controller and a Heater Blanket.
Now do I.....
1) Install them as seperate Systems having 2 arming switches?
or
2) Incorporate them into one single system with one arming system?
I've downloaded the 'How to's' for both wiring the Minimax V1 (minus the TPS) and the Heater Blanket, but I haven't seen one that incorporates them both?
Components I have to install.
SB100i
Minimax V1
Heater Blanket c/w Pressure Switch
2 x Arming Switches
Relays
Fuse Carriers
etc.
Oh...On the Minimax Circuit, there is a 20A inline Fuse, but on the Heater Blanket there isn't.
As a precaution is it worth putting one into the Heater circuit? If its done as 2 seperate circuits?
Apologies for the lame questioning, just thought I'd ask
Cheers all and have a good day
(Sorry originally posted this in the wrong section)